Home · Maps · About

Home > SubChat

[ Post a New Response | Return to the Index ]

[1 2]

< Previous Page  

Page 2 of 2

 

(1418504)

view threaded

Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion

Posted by Henry R32 #3730 on Sun Dec 4 13:47:04 2016, in response to Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion, posted by Steamdriven on Sun Dec 4 13:33:55 2016.

edf40wrjww2msgDetail:detailStr
It does have an overhead, briefcases only probably. I was mainly using the picture to illustrate a 6 across on standard gauge seating arrangement precisely to indicate that the NJT / LIRR 2x2 on 2 levels seating arrangement is, in fact, "comfortable" compared to what could happen.

Post a New Response

(1418508)

view threaded

Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion

Posted by Olog-hai on Sun Dec 4 14:18:59 2016, in response to Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion, posted by Henry R32 #3730 on Sun Dec 4 13:20:07 2016.

edf40wrjww2msgDetail:detailStr
E4 non-reserved? Would rather have the Green Class (2-2).

Post a New Response

(1418515)

view threaded

Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion

Posted by Steamdriven on Sun Dec 4 15:48:46 2016, in response to Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion, posted by Henry R32 #3730 on Sun Dec 4 13:47:04 2016.

edf40wrjww2msgDetail:detailStr
Oh, I see we agree about that 3/3! 3x2 is bad enough, better to add another train that handles the first few stops until 20% of the px get off (or on, inbound). If the train ahead is does not stop at those stations, the train spacing problem is (almost) solved.

Post a New Response

(Sponsored)

iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It

(1418534)

view threaded

Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion

Posted by Henry R32 #3730 on Sun Dec 4 18:05:37 2016, in response to Re: FRA ''preferred'' replacement Amtrak/MARC Baltimore tunnel now up to $4 billion, posted by Olog-hai on Sun Dec 4 14:18:59 2016.

edf40wrjww2msgDetail:detailStr
I could barely understand the ordering process at Kumagaya, forget about getting a green car seat:

 photo 18500162-d0af-4c33-be49-9072c183a262.jpg


As it is I needed to go to the booth at Tokyo because the ticket wasn't letting me out... for Shinkanesen you cannot use Suica for the "outer" station and the Shinkansen ticket for the "inner" station - before boarding you must exit, re-enter the outer station using the rail fare ticket, and shove both tickets into the Shinkansen turnstile simultaneously. Reverse process for exiting. Dumb!

Post a New Response

[1 2]

< Previous Page  

Page 2 of 2

 

[ Return to the Message Index ]