Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station (634458) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station |
|
Posted by Wallyhorse on Mon Jun 16 07:43:27 2008, in response to Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station, posted by trainsarefun on Sun Jun 15 13:22:33 2008. That's my point:My way of using the old SF station after the 1 moves to the new one would be this: RUSH HOURS ONLY: Shuttle train between Bowling Green and South Ferry, using the current OUTER loop station that is still currently the terminal for the 1 train. OVERNIGHT HOURS: 6 train extended from Brooklyn Bridge to "old" South Ferry (outer loop) station. ALL OTHER TIMES: 5 train terminates at South Ferry outer loop station instead of Bowling Green (when not going to Brooklyn) EXCEPT when the 2/5 swap routes in one direction. |