Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: And the (7) line gets a little slower....(and louder)

Posted by R36 #9346 on Sun Apr 6 19:28:56 2008, in response to Re: And the (7) line gets a little slower....(and louder), posted by trainsarefun on Sun Apr 6 15:08:42 2008.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The reasons Main Street is not efficient are as follows:

1. Stub-end tracks within the station.
2. Timers installed due to 1.
3. High volume of passengers using the station.
4. Improper behavior of some of those passengers.
5. Dispatch-related maladies.

I would suggest a track layout at Javits similar to that at 33rd Street PATH station, but make the switches accommodate a higher speed. However, I recognize that such decisions may have already been made.

The ultimate reason why the timers at TSQ are in place:



When a tail track is marked with a signal and a sign saying, "End of Signal Control," and another saying, "No Third Rail Power Beyond This Point," you might as well treat it as an End of Track.


Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]