Re: Why Did The Archer Ave Extension Take So Long To Open? (Re: 9/10/77) (979292) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Why Did The Archer Ave Extension Take So Long To Open? (Re: 9/10/77) |
|
Posted by Jackson Park B Train on Wed Sep 15 22:28:17 2010, in response to Re: Why Did The Archer Ave Extension Take So Long To Open? (Re: 9/10/77), posted by Chris R16/R2730 on Wed Sep 15 20:57:11 2010. depends how they are built, much of the Red Line in Chicago is on an embankment which must have proper drainage systems. And waiting for a train on an L is way wetter and colder than in a tunnel. |
(There are no responses to this message.)