Re: MTA’s Proposed 2025-2029 Capital Program |
|
Posted by Fisk Ave Jim on Sat Sep 21 14:05:07 2024, in response to Re: MTA’s Proposed 2025-2029 Capital Program, posted by AlM on Sat Sep 21 10:45:21 2024. Like I said in a prior post, electrification should be paired with track upgrades and platform extensions. The $$$ is just not there for all that. On the PJ line, the platforms are already long and the track is in good shape. Less overall work has to be done there for electrification (as long as there's room for the substations).Besides, the folks from the PJ line along with the Oyster Bay line would scream like hell if the 3d rail pipe dream extension went to Yaphank. |