Like I said in a prior post, electrification should be paired with track upgrades and platform extensions. The $$$ is just not there for all that. On the PJ line, the platforms are already long and the track is in good shape. Less overall work has to be done there for electrification (as long as there's room for the substations).
Besides, the folks from the PJ line along with the Oyster Bay line would scream like hell if the 3d rail pipe dream extension went to Yaphank.