Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) (722958) | |
Home > SubChat |
[ Post a New Response | Return to the Index ]
Page 4 of 4 |
(723498) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by BMTLines on Sat Dec 20 14:19:16 2008, in response to No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by TransitChuckG on Sat Dec 20 12:22:49 2008. Good thing I had already cancelled what I had planned for tomorrow. If any photographers show up with their models tomorrow and it is not a trade shoot then they will have to pay the model's minimum time (generally 3-4 hours) even if no pics are taken. |
|
(723515) | |
Re: No R1/9's tomorrow,was(Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by QM18Express on Sat Dec 20 15:39:41 2008, in response to Re: No R1/9's tomorrow,was(Re: Winter Operations Plan 4 In Effect Until Monday), posted by TransitChuckG on Sat Dec 20 13:44:54 2008. Yea tell me about it! I had a friend that I was going to take to see it tomorrow now have to wait another week and that week my friend would be in Long Island and would be a little bit of trouble for my friend unless they leave a little early on sunday to go back home 1st |
|
(723533) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Broadway Lion on Sat Dec 20 16:23:54 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by RockParkMan on Fri Dec 19 22:13:57 2008. NOPE.Look at your trusty 1964 subway map. You will *SEE* that they are listed as EXPRESS STOPS. ROARING |
|
(Sponsored) |
iPhone 6 (4.7 Inch) Premium PU Leather Wallet Case - Red w/ Floral Interior - by Notch-It
|
(723540) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Broadway Lion on Sat Dec 20 16:30:11 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Alex L. on Sat Dec 20 12:32:50 2008. NOPE!LION trembles to argue with the doyen of the MTA, but semantics are semantics. Yes the IND has a great deal of flexibility on Sixth Avenue, and any train *can* go anywhere, they cannot do so without getting in each other's way. Thus for efficient operation what yo are calling the "local" tracks really serve Queens in the north and the Rutgers tunnel in the south. What you are calling the "express" tracks really serve da bronix in the north, and the Manhattan Bridge in the south. Besides, if you look at the 1964 map it CLEARLY shows that 14th Street and 23rd Street *ARE* "EXPRESS" Stops and are so marked. ROARING |
|
(723550) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by BMTLines on Sat Dec 20 16:48:00 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Broadway Lion on Sat Dec 20 16:30:11 2008. Besides, if you look at the 1964 map it CLEARLY shows that 14th Street and 23rd Street *ARE* "EXPRESS" Stops and are so marked.That's because in 1964 the bypass tracks were not open yet. IIRC all trains stopped at both 14th and 23rd. |
|
(723552) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Broadway Lion on Sat Dec 20 17:01:41 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by BMTLines on Sat Dec 20 16:48:00 2008. Facts, Facts, Facts...I *know* that part of the equation, but it does not fit my story line. ROAR |
|
(723600) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Wado MP73 on Sat Dec 20 19:02:09 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by checkthedoorlight on Sat Dec 20 12:24:45 2008. Indeed they were and at irregular intervals, making the platform at 34th St. a zoo. |
|
(723601) | |
Re: PHOTOS ::::: ((Was: Snowfanning Railfanning (Was: Winter Operations Plan 4 In Effect Until Monday)) |
|
Posted by Terrapin Station on Sat Dec 20 19:07:26 2008, in response to Re: PHOTOS ::::: ((Was: Snowfanning Railfanning (Was: Winter Operations Plan 4 In Effect Until Monday)), posted by Hank Eisenstein on Fri Dec 19 16:23:42 2008. I was well within the 18 minutes. |
|
(723602) | |
Re: PHOTOS ::::: ((Was: Snowfanning Railfanning (Was: Winter Operations Plan 4 In Effect Until Monday)) |
|
Posted by Terrapin Station on Sat Dec 20 19:07:39 2008, in response to Re: PHOTOS ::::: ((Was: Snowfanning Railfanning (Was: Winter Operations Plan 4 In Effect Until Monday)), posted by RAILFAN_7_40ST on Fri Dec 19 18:43:03 2008. Thanks RAILFAN! |
|
(723610) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Terrapin Station on Sat Dec 20 19:18:57 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by BMTLines on Fri Dec 19 13:01:16 2008. nude model?!?!?!? |
|
(723618) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Andrew Saucci on Sat Dec 20 19:34:45 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Broadway Lion on Fri Dec 19 22:10:03 2008. I never thought of it that way, but I kind of agree. In midtown Manhattan, the 6 Ave tracks could be called "express" and "local" but the designations deteriorate north and south of there. The F is an express in Queens and the B is local in upper Manhattan and the Bronx. |
|
(723653) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by Newkirk Images on Sat Dec 20 20:29:27 2008, in response to No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by TransitChuckG on Sat Dec 20 12:22:49 2008. Let's hope for better weather on 12/28.Bill "Newkirk" |
|
(723669) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by Steve B-8AVEXP on Sat Dec 20 20:58:49 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by Jeff Rosen on Sat Dec 20 13:20:16 2008. 1575 has heard it all. Sticks and stones.... |
|
(723684) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by checkthedoorlight on Sat Dec 20 21:15:20 2008, in response to Winter Operations Plan 4 In Effect Until Monday, posted by Railman718 on Fri Dec 19 11:20:51 2008. Did a trip around the system today. It looks like they were kind of half-assing the Plan 4.G running its usual weekend pattern - Court Sq to Smith-9, OPTO, 4 cars, deadhead to Church and back. Note that the G was SUPPOSED to run to 71 this weekend, but I guess that's too much to ask for N running LOCAL in Brooklyn, via Bridge, LOCAL in Manhattan. My R160 made the proper transfer announcements at Pacific & Dekalb D was running express, including through the bypass Q was running express both lines of the IRT were running all local uptown, and normal service downtown (including the 4 turning at Utica) The 7 was running normal. I THOUGHT I saw some snowbirds on the express track on 4th Ave, but that would be impossible with D running express. I otherwise didn't see any snowbirds. |
|
(723711) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Bill From Maspeth on Sat Dec 20 22:38:58 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by checkthedoorlight on Sat Dec 20 21:15:20 2008. Some tracks are available for service during the day Saturday and Sunday but not available evenings and midnights because some snowbirds are needed to run during the day......the winter operations plan calls for 4 car G OPTO to Court Sq. only since at times trains are laid up on express tracks between Roosevelt and Continental and the local tracks can't handle more than 3 services (E/F/R). Maybe not during the day, but around 8 or 9 PM layups begin on those express tracks. Same goes for AM put ins. M-F they come out earlier than on S and S......OPTO M was not. 8 car trains were ran so conductors were hired, usually construction flaggers (who were thrilled to be working the road) whose Go related jobs were cnacelled due to Plan 4. |
|
(723712) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Osmosis Jones on Sat Dec 20 22:46:48 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by checkthedoorlight on Sat Dec 20 21:15:20 2008. I THOUGHT I saw some snowbirds on the express track on 4th Ave, but that would be impossible with D running express. I otherwise didn't see any snowbirds.You did, they're storing trains on the Southbound express tracks. |
|
(723713) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Osmosis Jones on Sat Dec 20 22:47:46 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Bill From Maspeth on Sat Dec 20 22:38:58 2008. construction flaggers (who were thrilled to be working the road) whose Go related jobs were cnacelled due to Plan 4.I didn't know that flaggers were also conductors, that's very strange but interesting. |
|
(723717) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by Bill From Maspeth on Sat Dec 20 23:04:10 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Osmosis Jones on Sat Dec 20 22:47:46 2008. Conductors can pick jobs called "Construction Flagging". Gets them off the road and away from the public. The higher your number, the higher chance of working the road and very seldom you're flagging. In the case of Plan 4, even the most senior guy could be working the road this weekend. |
|
(723736) | |
Re: Winter Operations Plan 4 In Effect Until Monday |
|
Posted by BMTLines on Sun Dec 21 00:30:28 2008, in response to Re: Winter Operations Plan 4 In Effect Until Monday, posted by Terrapin Station on Sat Dec 20 19:18:57 2008. Would've been real vintage as opposed to pinup and she was willing to do TFCD for this one even though she normally charges an hourly rate that is way over my head.You would be surprised as to how many women want to pose with this train - I put out a "casting call" on Model Mayhem and received almost 20 responses within hours. Oh well - looks like I will have to wait for next year... |
|
(724338) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by William A. Padron on Mon Dec 22 09:56:35 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by Steve B-8AVEXP on Sat Dec 20 20:58:49 2008. >>1575 has heard it all. Sticks and stones....<<All I can say for now only (not then from its regular service past) that #1575 on these Sunday "V" line runs for the Holiday season, so far, have run without any problems. While no personal offense from Mr. Rosen himself at all (he or anyone else is free and allowed to say whatever on his mind), I did hear his comments out loud about his dislike for #1575 and the R-10's in general (as previously on this Subchat forum), when he was on board on one of the train's runs while accompanying his son with him. -William A. Padron ["Wash.Hts.-8th Av.Exp."] |
|
(724339) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by Newkirk Plaza David on Mon Dec 22 10:00:38 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by Chris R16/R2730 on Sat Dec 20 13:14:06 2008. The Giants are playing a meaningless game. They locked up the No. 1 seed last night.Don't forget about the Philly trip next Monday. |
|
(724416) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by Steve B-8AVEXP on Mon Dec 22 13:29:54 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by William A. Padron on Mon Dec 22 09:56:35 2008. 1575 has run flawlessly on every mnuseum trip for the past five years. |
|
(724469) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by William A. Padron on Mon Dec 22 15:44:11 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by Steve B-8AVEXP on Mon Dec 22 13:29:54 2008. And these days on the times that I have personally myself rode on #1575 in the last few years in regular service...no door leaf problems so far!-William A. Padron ["Special"] |
|
(724484) | |
Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday) |
|
Posted by TransitChuckG on Mon Dec 22 16:07:14 2008, in response to Re: No R1/9's tomorrow,was9Re: Winter Operations Plan 4 In Effect Until Monday), posted by Newkirk Images on Sat Dec 20 20:29:27 2008. Let's hope for better weather on 12/28.Looks like mild and rainy, on the NYC 10 day weather forecast. This real cold /snow thing is being replaced by milder air. |
|
Page 4 of 4 |