Re: 9/10/77 (977677) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 9/10/77 |
|
Posted by Zman179 on Fri Sep 10 23:07:09 2010, in response to Re: 9/10/77, posted by Chris R16/R2730 on Fri Sep 10 19:28:27 2010. The elevated tracks were severed at the LIRR right-of-way very shortly after the shortening of the line to 121 St. in order to allow for construction of the Archer Av extension. |