Re: EXCLUSIVE PHOTOS: New Jerome line AM express starts test phase on June 8 (792522) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: EXCLUSIVE PHOTOS: New Jerome line AM express starts test phase on June 8 |
|
Posted by Chris R16/R2730 on Thu Jun 4 12:20:52 2009, in response to Re: EXCLUSIVE PHOTOS: New Jerome line AM express starts test phase on June 8, posted by Newkirk Plaza David on Thu Jun 4 11:49:02 2009. And cutting the Z would have left the entire line servied with J trains running every 10 minutes, which would be unacceptable. So any Z-less schedule would have necessitated many more J trains to be added. Before the Z was introduced the J ran at a maximum of 6 minute headways. That's 10 TPH. The J/Z currently uses 12 TPH. That's why cutting the Z would have been pointless, as the actual savings would have been minimal. 8 TPH is also not enough. They used this headway in the aftermath of 9/11 when the J and M ran to 95th St and Coney Island respectively and the trains were just too crowded (and demand then was less). |