Re: 42nd Street Shuttle to Jerome? (748359) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 42nd Street Shuttle to Jerome? |
|
Posted by Stef on Tue Feb 24 15:34:55 2009, in response to Re: 42nd Street Shuttle to Jerome?, posted by Grand Concourse on Tue Feb 24 14:50:15 2009. >>Plus from Jerome yard the 7 of 10 cars can easily access the shuttle from the downtown local track.Btw, should the shuttle on the TS side be reconstructed to fit 5-car trains, do you think they will keep track 4 open or just use it for 'storage'.<< I agree with your post about the 7 cars that have access from the Local Track, Tracks 1 and 3 are connected to the East Side, no problems there.... Track 4 on the other hand, is problematic. The Shuttle comes into TS on a curve, not all doors in the last car of that train open (on the Grand Central End). If the plans for the Shuttle Rehab ever comes to frution, Track 4 would be abandoned, while 1 and 3 could be lengthened to hold 5 cars on each. All Plans are subject to change, let's wait and see how this plays out. Of course if that happens, and we get 5 car trains, there would be no need for single unit R62A's. -Stef |