Re: KTLA CONFIRMS: Re: Metrolink engineer texting with railfans (681099) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: KTLA CONFIRMS: Re: Metrolink engineer texting with railfans |
|
Posted by Easy on Sun Sep 14 11:50:06 2008, in response to Re: KTLA CONFIRMS: Re: Metrolink engineer texting with railfans, posted by Dutchrailnut on Sun Sep 14 11:46:21 2008. They're saying on the local news that one of the things that the NTSB will be looking at is why the switch failed. They're saying that the Metrolink train should have been automatically switched to a siding. |