Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station (634618) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station |
|
Posted by Hank Eisenstein on Mon Jun 16 15:09:33 2008, in response to Re: Keeping old South Ferry station open for the Lexington line after the 1 moves to its new station, posted by Wallyhorse on Mon Jun 16 07:22:59 2008. Reviving the shuttle makes no sense; any peak-hour service to the SF Loop station makes no sense, given the expense of building the new terminal. For off-hour trains, however, it makes some sense; but only for the 5, which ALREADY makes the loop, but does not stop. Crossing 6 trains into the existing Lex service south of Brooklyn Bridge overly complicates train movements. Getting to the shuttle platform at Bowling Green from either of the mainline platforms, especially in a rush crowd, can take as much time as simply heading for the exit, and walking to the boat. |