Re: And the (7) line gets a little slower....(and louder) (596253) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: And the (7) line gets a little slower....(and louder) |
|
Posted by #5 - Dyre Ave on Sun Apr 6 15:06:44 2008, in response to Re: And the (7) line gets a little slower....(and louder), posted by trainsarefun on Sun Apr 6 14:37:55 2008. True, but the Javits Center station will have lengthy tail tracks that will extend to (I believe) 26th St. Main St's three tracks are stub-ended within the station, like most NYC subway terminals. Javits Center will be able to have extra trains stored beyond the station that could be put into service if needed. That can't be done at Main St because the tracks dead-end within the station and I don't think there's currently enough room to fit a full-length train on the current tail tracks (of which there are only two) at Times Sq. |