Re: SAS Phase 3 Includes Increased Capacity Through Roosevelt Island (559354) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: SAS Phase 3 Includes Increased Capacity Through Roosevelt Island |
|
Posted by SMAZ on Sat Jan 26 03:13:19 2008, in response to Re: SAS Phase 3 Includes Increased Capacity Through Roosevelt Island, posted by Grand concourse on Sat Jan 26 03:03:08 2008. Have the (V) break off into the unfinished tunnels that were meant to connect to the Old Rock after 63rd Drive. The tunnels would of course be completed. That would leave enough capacity for the (R) and the SAS train at 71st St. (or have the R break off) |