Re: Staten Island Railway (490035) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Staten Island Railway |
|
Posted by Rail Blue on Fri Sep 14 11:08:36 2007, in response to Re: Staten Island Railway, posted by R30A on Thu Sep 13 23:17:26 2007. Also-- The headway issue could be easily solved by alternating trains to the northshore and southshoreYou've got the scale all wrong. The SIR runs 4tph local and 4tph express tops, using 300' trains. Assuming that the North Shore has the same level of demand, if you doubled the train lengths, you'd still be left with 8tph tops. It's just nowhere near enough to justify that tunnel on its own. |