Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: (7) line extension stations will feature platform-to-ceiling doors

Posted by randyo on Sun Sep 9 18:14:45 2007, in response to Re: (7) line extension stations will feature platform-to-ceiling doors, posted by G1Ravage on Sat Sep 8 16:22:46 2007.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
When I was doing IRT schedules, there were actually 2 dropbacks at T/Sq Qns on the Flushing Line in the AM and PM, and during the midday there was always 1. Due to the frequency of service and passenger volume on the Flushing Line, It is a necessity to have a dropback crew in place during peak periods. By rhe way, once the new terminal at So/Fy is built, it will require at least one additional train and 2 addtional crews since the logistics at the new terminal will preclude crews from taking their own trains back to V/C during peak periods and the time it takes to dump the train and recharge will definitely mandate at least the 1 additional train in the car requirements.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]