Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Some Subways Found Packed Past Capacity

Posted by shadyelstation on Tue Jun 26 20:08:33 2007, in response to Re: Some Subways Found Packed Past Capacity, posted by WillD on Tue Jun 26 16:07:37 2007.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Pardon? How would that work? A new tunnel under the East River or somehow joining the 63rd St tunnel then avoiding the connector with the Queens Blvd lines?

The SAS FEIS mentions construction of non-revenue connections to Queens using parts of the 63 St Connector. If such a line would run in revenue it would probably be via Queens Blvd (which could pose a problem due to capacity issues already present on Queens Blvd).

Why not find a way to connect the SAS to what might be called the South 4th St subway

Would this South 4th Street subway connect to, say, a Utica Avenue Subway (to Kings Plaza)?

An idea I have for such a line is to have a branch of SAS turn south of 14 St, onto Houston St, going to South 4 and eventually running under Utica to Kings Plaza.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]