Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread | Next in Thread ]

 

view flat

Re: LIRR East Side Access

Posted by Broadway Lion on Tue May 23 11:45:59 2006, in response to Re: LIRR East Side Access, posted by KLCS on Tue May 23 02:28:02 2006.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d

You can install high speed turnouts, but it's tight down in those old tunnels. They would need structural modifications.

You cannot install "high spped" turnouts.

All a high speed turnout is, is a higher frog number, with a longer length switch. Try building it on your model railroad. I did. I could not use No. 6 switches in my terminals because the terminal would then be longer than my table. I had to settle for No. 4 switches in the terminals. ERGO slower trains.

NYP has an incredibly complex interlocking system with train running across many switch point between the platform and the tunnel. The train must be clear of the entire route before the interlocking plant will allow the realignment of switches for the next train. After all that *is* what an interlocking plant is, and why they call it thus.

RORA


Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]