Re: Richmond Hill (202741) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Richmond Hill |
|
Posted by SMAZ on Thu Jan 19 08:08:17 2006, in response to Re: Richmond Hill, posted by Line 13 on Wed Jan 18 23:18:24 2006. after ESA, I would like to see a connection built from the LM terminal area in LIC to the southern NYP East River tunnel and have it thru run with NJT. Main Line LIRR would also access the same tunnel and thru-run with NJT. The Northern tunnel would be taken over by a new MNR-NH service to NYP and by Amtrak. LIRR ESA would be using the new connection to the 63d St tunnel to GCT as scheduled. |