Re: Most Physically Completed Station to Never Be Used? (1637123) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Most Physically Completed Station to Never Be Used? |
|
Posted by New Flyer #857 on Wed Nov 6 14:43:28 2024, in response to Re: Most Physically Completed Station to Never Be Used?, posted by Q4 on Wed Nov 6 13:48:37 2024. That had to be quite a bold move - basically taking the gamble that it would be more important to have the Broadway Express tracks feed Brooklyn directly and bypass Lower Manhattan (back at a time when Lower Manhattan was more the center of things).I say it's bold because the move didn't mean just building a switch or two but rather changing entire elevations (when it came to the express tracks) and then stub-ending a potential three-track station. Even if, as wikipedia suggests, the Broadway Express - Manhattan Bridge path was only meant to be for the short-term, I'd say enough was done with the structure / elevations that they had to know it was more than that. And it turned out to make sense, now that Midtown is what it is, but I wonder how many were sure about it back then. |