Re: PHOTOS: POSITION LIGHT LAST CALL (1524930) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: PHOTOS: POSITION LIGHT LAST CALL |
|
Posted by Broadway Lion on Mon Sep 23 08:23:57 2019, in response to Re: PHOTOS: POSITION LIGHT LAST CALL, posted by randyo on Mon Sep 23 02:13:29 2019. GRS practice puts the signal levers at either end of the lever row. Trains transversing the modelboard from let to right has ALL of their signal leverson the left. Trains transversing from right to left have all of their signal levers on the right.The switch levers are in the middle from left to right following the numbers on the model board. Signals are painted RED, Switches were black. In the days of the armstrong levers the locks were painted blue. On railroad of lion, non-pax switch levers are painted yellow. A revenue train may not be moved onto those tracks ie pockets etc. ROARING |
![]() |
![]() |
![]() |