Re: (M) train during (L) tunnel closure (1394403) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: (M) train during (L) tunnel closure |
|
Posted by randyo on Tue May 3 16:44:07 2016, in response to Re: (M) train during (L) tunnel closure, posted by #5 - Dyre Ave on Mon May 2 22:09:35 2016. If some of you recall, the R was routed all the way to 179 St but was eventually cut back to Ctl due to the additional length of the line impacting on service reliability. Even operating out of Continental, the on time performance of the line leaves a lot to be desired. |