Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: W train returning when Phase I of the 2nd Av subway opens in December 2016?.

Posted by Stephen Bauman on Sun Dec 20 15:59:38 2015, in response to Re: W train returning when Phase I of the 2nd Av subway opens in December 2016?., posted by Dyre Dan on Sun Dec 20 15:35:38 2015.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
The average headway would seem to be between 2 and 3 minutes, meaning between 20 and 30 tph. How do you figure 40?

Headways depend on two things: the ability of the signals/dwell times to handle the headways and operating trains to meet the headway. The first can be tested by operating trains at various headways. This will establish a minimum headway.

Did you notice any 90 second headways?

There were 5 such examples.

The merge is at 11th St in Queens. If the tunnel signals could not handle 90 second headways, their arrival at Lex/59th would not show a 90 second headway.

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]