Re: NJT Arrow III on non-electrified track in Hoboken Terminal (1345921) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: NJT Arrow III on non-electrified track in Hoboken Terminal |
|
Posted by Olog-hai on Sun Mar 29 21:24:09 2015, in response to Re: NJT Arrow III on non-electrified track in Hoboken Terminal, posted by Wado MP73 on Sun Mar 29 17:33:11 2015. And how are you going to retool something like that for a platform that's about 48" above rail? Never mind their 9' 3" width for a loading gauge meant for 10' 6" wide cars.At least they show that the MLV power car with two levels is possible. |
(There are no responses to this message.)