Home · Maps · About

Home > SubChat
 

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

 

view flat

Re: Air Train Proposed To Connect (7) Line With LaGuardia Airport; video

Posted by Joe V on Sat Jan 24 11:05:50 2015, in response to Re: Air Train Proposed To Connect (7) Line With LaGuardia Airport; video, posted by Avid Reader on Sat Jan 24 10:51:45 2015.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
Sounds like a conceptual, connect the dots planner scheme that has no acceptance of reality.

Neither Amtrak nor LIRR will tolerate a Sunnyside station as it would gunk up the operations around Harold.

The Main Line to Hicksville is stuck at 2 tracks for the forseeable decade.

The Lower Montauk has been leased about to the NY&A. LIRR does not have trackage rights without a pilot.

PATH and WMATA type rolling stock cannot run on a FRA RR requiring 800,000 lbs buff strength. PATH has a partial exemption at 400,000 lbs. Other rapid transit is at best 200,000 lbs

(There are no responses to this message.)

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]