Re: AirTrain Proposed To Connect (7) Line With LaGuardia Airport ($450 Million, 5 years) |
|
Posted by Stephen Bauman on Thu Jan 22 20:53:55 2015, in response to Re: AirTrain Proposed To Connect (7) Line With LaGuardia Airport ($450 Million, 5 years), posted by BrooklynBus on Thu Jan 22 09:11:13 2015. That's a non-sequitur. I was comparing relative loading on the Astoria Line before and after a proposed spur to LGA. The Flushing Line never entered into the discussion.However, to satisfy your idee fixe: The Flushing Line currently operates a max of 28 tph; 11 car trains; each with a service level capacity of 110. The Astoria Line currently operates 20 tph; 10 car trains; each with service level capacity of 145. The Flushing Line operates an hourly service level capacity of 33,800 passengers. The Astoria Line operates an hourly service level capacity of 29,000. |