Re: Air Train Proposed To Connect (7) Line With LaGuardia Airport; video (1334757) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Air Train Proposed To Connect (7) Line With LaGuardia Airport; video |
|
Posted by Stephen Bauman on Tue Jan 20 22:42:40 2015, in response to Re: Air Train Proposed To Connect (7) Line With LaGuardia Airport; video, posted by The Silence on Tue Jan 20 20:41:40 2015. proximity to Stengel depot. cuts down deadheading.Not all the bus routes use that depot. Almost all the buses would have to add that extra mile to each trip. That more than wipe out any mileage reduction from deadheading. If bus traffic is to be reduced in Downtown Flushing, buses will have to terminate east of Main St. There simply are not enough roads going between Main St and Willets Pt. There are a lot of buildings in the way, as well as the Flushing River and associated wetlands. |