Re: Third Avenue/Culver El Re-builds |
|
Posted by Nilet on Sun Oct 5 03:05:19 2014, in response to Third Avenue/Culver El Re-builds, posted by Wallyhorse on Sun Oct 5 02:57:02 2014. The plan I have would have two levels and four tracks total with platforms set up like the CPW line for local stations and island platforms for express stations, with 60th-63rd designed to be the busiest station on the line.Express tracks on the upper level makes more sense. Single tracks on two levels is also how I would be looking to do a re-build of the Culver El... Most of the Culver El is already standing. The stub between 9th Avenue and Ditmas is not coming back— the ROW is already built up. |