Re: Old LIRR Rockaway Beach Branch (1252654) | |||
![]() |
|||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
![]() |
Re: Old LIRR Rockaway Beach Branch |
|
Posted by Stephen Bauman on Wed Oct 9 18:33:03 2013, in response to Re: Old LIRR Rockaway Beach Branch, posted by randyo on Wed Oct 9 18:16:32 2013. I did allude to track brakes in another post.The point I was making is that 40 tph capacity is possible with Dual Contracts technology. Inasmuch as we do not schedule 75% of that capacity on any line, increasing capacity 40 tph to 44 tph isn't going to change anything. |
![]() |
![]() |
![]() |