Re: R39's and Myrtle El Speculations Re: Metropolitan/Myrtle el (124584) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: R39's and Myrtle El Speculations Re: Metropolitan/Myrtle el |
|
Posted by Chris R16/R2730 on Mon Aug 8 17:53:03 2005, in response to Re: R39's and Myrtle El Speculations Re: Metropolitan/Myrtle el, posted by Rail Blue on Sun Aug 7 19:38:09 2005. But lower 2nd and 3rd Aves never were rebuilt to handle heavy subway cars. All of the other el rebuilds (Broadway, Fulton St, etc) were done with definitive plans to connect them into the subway system. |