Re: Well, this is interesting... (Re: South Ferry (1) Train Station Fix Could Take Up To 3 YEARS!!!)

Posted by Dyre Dan on Fri Feb 8 18:00:13 2013, in response to Re: Well, this is interesting... (Re: South Ferry (1) Train Station Fix Could Take Up To 3 YEARS!!!), posted by Wallyhorse on Wed Feb 6 22:35:34 2013.

edf40wrjww2msgDetail:detailStr
fiogf49gjkf0d
So is the south entrance to Whitehall St. station (the one connected to South Ferry station) closed? Since it is not dependent on the damaged electrical equipment for the (1) line, couldn't it be reopened? Is it because the equipment controlling the turnstiles there is part of what was damaged? Or the escalators? If they could reopen that entrance, and institute an out-of-system transfer between the two Rector St. stations, that should be able to handle things until South Ferry can be repaired. The other possible interim solution would be to reopen the loop station temporarily, but that would take longer to implement.

Responses

Post a New Response

Your Handle:

Your Password:

E-Mail Address:

Subject:

Message:



Before posting.. think twice!


[ Return to the Message Index ]