Re: 76st what happened? (1033336) | |||
Home > SubChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: 76st what happened? |
|
Posted by Newkirk Images on Wed Feb 2 16:53:38 2011, in response to Re: 76st what happened?, posted by SelkirkTMO on Wed Feb 2 16:32:25 2011. Just to throw another fly into the soup for giggles ... station and mezzanine construction likely wouldn't happen until the station itself was structurally complete (I mean steelwork and concrete, not tiles) whereupon the structure above would be built up after the foundation and base were done. So it isn't outside the realm of possibility for the station shell and roof to have even been completed before any work on that above it would proceed. POSSIBLY the timing was such that they didn't get that far, or perhaps they did and the roof was never placed on a mezzanine and that which was done was backfilled at the surface, leaving only the floor of the mezzanine and nothing above it.Yeah, I'll buy that. That would rule out construction photos. We could go on for years talking about this, but we will only grow older ! Bill Newkirk |