Re: Time to put this myth to rest Was: 76st what happened? |
|
Posted by Newkirk Images on Mon Jan 31 12:37:09 2011, in response to Re: Time to put this myth to rest Was: 76st what happened?, posted by Randyo on Mon Jan 31 02:43:09 2011. At the time construction was started on the dual contract lines, there was a lot of waffling as to which of the 2 companies would get which lines so there were provisions built so that any of the new lines could be connected to either companies' existing lines with a minimum of difficulty.Does lower level Nevins St. figure in with this ? Bill Newkirk |