Re: Why 2 Terminals for Q1? (345301) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Why 2 Terminals for Q1? |
|
Posted by New Flyer #857 on Sun Apr 17 14:10:24 2022, in response to Re: Why 2 Terminals for Q1?, posted by checkmatechamp13 on Sun Apr 17 09:33:43 2022. There was an idea floating around that the Brooklyn redesign will involving servicing Mill Basin in a whole different manner. One draft map I think was posted around here recently suggested sending the B47 there but that would probably be fought, as there would be more worse / more distant connections to the subway. The Bergen Beach branch of the B41 (which would probably have a whole different number and not originate as far away as Downtown Brooklyn) could be a a candidate for Mill Basin, but still it will probably be hard (and also not a good idea anyway) to take away Mill Basin's connection to the Brighton Express. At the end of the day, I think the B100 will hold on as is. (Remember, this same draft map involved having no buses going through Grand Army Plaza). |