Re: Bronx Bus Network Redesign Final Plan Addendum (344106) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: Bronx Bus Network Redesign Final Plan Addendum |
|
Posted by New Flyer #857 on Mon Dec 6 07:15:59 2021, in response to Re: Bronx Bus Network Redesign Final Plan Addendum, posted by checkmatechamp13 on Sun Dec 5 20:42:35 2021. The big benefit of not relying on the sidewalk machines is that there will be less hesitancy to add stops. You can have more complex types of routings, such as those that stop every 0.1 mile for a stretch to collect riders and then later on every 0.5 miles or more where it turns into an express (or something like that). |
(There are no responses to this message.)