Re: BxM4C spared (for now) Re: BxM4B to replace BxM4C? (194042) | |||
Home > BusChat | |||
[ Read Responses | Post a New Response | Return to the Index ] |
|
Re: BxM4C spared (for now) Re: BxM4B to replace BxM4C? |
|
Posted by JAzumah on Fri Apr 30 01:20:19 2010, in response to Re: BxM4C spared (for now) Re: BxM4B to replace BxM4C?, posted by trav-one on Thu Apr 29 23:21:29 2010. LOL...not going to happen. The whole point is to force everyone on the train. The MTA is not going to run a full length 4C except at gunpoint. This is designed to embarass the riders. When ridership falls by a big number in a short period of time, the route will be shut down at the end of the year. They want everyone on the train.Westchester likes to synchronize its fare increases with the MTA. This means that a fare hike may be in the works for September. |
(There are no responses to this message.)